One_live95
05-10-2006, 03:05 PM
well i fabbed up some brackets with some sheet aluminum(20 ga), some 1/2 alum tubing, and had them welded onto the tanks, now the rad mounts as stock one would, the materials were here and there, and a few bucks for the tubing at the recycling place.
http://www.mustangmods.com/ims/u/698/4479/53634.jpg
http://www.mustangmods.com/ims/u/698/4479/53635.jpg
http://www.mustangmods.com/ims/u/698/4479/53636.jpg
The welding however did cost me about 30$, but i have almost exactly 200$ in this one versus the fluidyne, tell me the difference.
what you guys think
jason
http://www.mustangmods.com/ims/u/698/4479/53634.jpg
http://www.mustangmods.com/ims/u/698/4479/53635.jpg
http://www.mustangmods.com/ims/u/698/4479/53636.jpg
The welding however did cost me about 30$, but i have almost exactly 200$ in this one versus the fluidyne, tell me the difference.
what you guys think
jason