StreetStangs.net  

Go Back   StreetStangs.net > Technical > Project Cars
FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 06-11-2006, 11:25 AM   #21
89 Hoss
Mustang Retailer
 
89 Hoss's Avatar
 
Join Date: Oct 2005
Location: Anniston
Posts: 986
Re: project 2

Just got finished leveling out the gt. Bought these little spring inserts to level the gt back out. The black one sat alittle lower on the passenger side so i bought these spring inserts to level the car out i guess it was about 1/4 of an inch off. Now i will go back and do the coupe the same way. not today though. Next is to move the battery to rear of the gt and smooth out the engine bay and move some wiring. will post pics of the gt soon i have to finish moving the exhaust up a little just to clean that up some.
__________________
2007 SHELBY GT CSM073649

1992 Black on Black Vert lx 5.0

1985 Chevy c10 383 stroker

2000 Jeep Grand Cherokee 4.7 (daddy mobile)
89 Hoss is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 10:36 PM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.